USA
USA

myGeobrugg

Réotier, Versant de Mensolles

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Before installation of the protecting solution

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of the shallow landslide (SL-150) barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Overall view of SL-150 barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

During installation of the SL-150 barrier

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of the Low water channel made of blocks set in concrete

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of a foundation block at the foot of a post

Hangmuren- und Murgangschutz - Réotier, Versant de Mensolles 2024

Detail of an end post

 

Systeme

 

Systemlänge

42 m

 

Installationsjahr

2024

Ausgangslage

Following an exceptional rainfall event in November 2023, a mudslide mobilizing a volume of around 600 to 800 m³ reached and covered the rail track over a distance of more than 30 meters. As a result of this event, the railway line was interrupted and restricted for several months. The Mensolles slope had to be secured against the residual volumes of material that could potentially be remobilized following the event.

Massnahme

Geobrugg assisted the SNCF with the design and supervision of a 42-meter-long mudflow barrier.

The central part of the barrier was completed by a wide masonry ditch to channel the flow of almost permanent runoff water to a hydraulic structure at the track level.


The work was completed in spring 2024, and the temporary speed limits (LTV) in place on the Mensolles slope since December 2023 were withdrawn early in July 2024 before the summer season.

Land/Region

Frankreich

Kunde

Planer

SNCF Réseau

Ausführende Firma

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Kontakte: Bei Fragen sind wir gerne für Sie da.

Saleh Feidi
 

Saleh Feidi

Acting General Manager North America / Sales Manager California and Nevada

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Acting General Manager North America / Sales Manager California and Nevada

E-Mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA Regional Sales Manager Northeast

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

E-Mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

E-Mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

E-Mail