Böschungsstabilisierung - Cwmavon Landslide 2018

Completed site image from the south of site.

Böschungsstabilisierung - Cwmavon Landslide 2018

Slope after failure and cleaning

Böschungsstabilisierung - Cwmavon Landslide 2018

Site after tree clearance

Böschungsstabilisierung - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Böschungsstabilisierung - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Böschungsstabilisierung - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Böschungsstabilisierung - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

Installationsjahr

2018

Ausgangslage

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geologie

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Massnahme

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Kunde

Neath Port Talbot county borough council

Ausführende Firma

Quantum Geotechnical

Geschützte Objekte

Strasse, Wohngebiet, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Remedy Geotechnics

Subunternehmer

iBEX technical access

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail