Böschungsstabilisierung - Cwmavon Landslide 2018

Completed site image from the south of site.

Böschungsstabilisierung - Cwmavon Landslide 2018

Slope after failure and cleaning

Böschungsstabilisierung - Cwmavon Landslide 2018

Site after tree clearance

Böschungsstabilisierung - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Böschungsstabilisierung - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Böschungsstabilisierung - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Böschungsstabilisierung - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 
 

Installationsjahr

2018

Ausgangslage

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geologie

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Massnahme

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Land/Region

Vereinigtes Königreich (UK)

Kunde

Neath Port Talbot county borough council

Planer

Remedy Geotechnics

Ausführende Firma

Quantum Geotechnical

Subunternehmer

iBEX technical access

Geschützte Objekte

Strasse, Wohngebiet, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Umweltingenieur

Naturgefahren
Uferschutz/Wasserbau
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz , Msc. Env. Eng. Umweltingenieur

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail