Consolidamento di versanti - Cwmavon Landslide 2018

Completed site image from the south of site.

Consolidamento di versanti - Cwmavon Landslide 2018

Slope after failure and cleaning

Consolidamento di versanti - Cwmavon Landslide 2018

Site after tree clearance

Consolidamento di versanti - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Consolidamento di versanti - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Consolidamento di versanti - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Consolidamento di versanti - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Consolidamento di versanti - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Consolidamento di versanti - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 
 

Anno di installazione

2018

Situazione iniziale

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geologia

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Descrizione

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Paese / Regione

Regno Unito

Cliente

Neath Port Talbot county borough council

Progettazione:

Remedy Geotechnics

Contraente:

Quantum Geotechnical

Altre società partecipanti

iBEX technical access

Oggetto protetto

Strada, Zona residenziale, Infrastrutture

Protezione dalla corrosione

GEOBRUGG SUPERCOATING

Il contatto locale

Saleh Feidi
 

Saleh Feidi

Acting General Manager North America / Sales Manager California and Nevada

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / Stati Uniti Acting General Manager North America / Sales Manager California and Nevada

E-mail

Bryant Jackson
 

Bryant Jackson

Regional Sales Manager Northeast

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / Stati Uniti Regional Sales Manager Northeast

E-mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,KS 67226 Wichita / Stati Uniti Regional Manager Rocky Mountains / Central USA

E-mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / Stati Uniti Regional Sales Manager Southeast

E-mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Sistemi contro il dissesto idrogeologico
DPC per l’industria e l’edilizia
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / Stati Uniti Regional Sales Manager Pacific Northwest and Hawaii

E-mail