Stabilizacja skarp - Cwmavon Landslide 2018

Completed site image from the south of site.

Stabilizacja skarp - Cwmavon Landslide 2018

Slope after failure and cleaning

Stabilizacja skarp - Cwmavon Landslide 2018

Site after tree clearance

Stabilizacja skarp - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Stabilizacja skarp - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Stabilizacja skarp - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Stabilizacja skarp - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Stabilizacja skarp - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Stabilizacja skarp - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

Zastosowane systemy

 

Rok Instalacji / Montazu

2018

Sytuacja początkowa

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geologia

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Opis zastosowanego rozwiazania

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Inwestor

Neath Port Talbot county borough council

Wykonawca

Quantum Geotechnical

Chroniony Objekt

Road, Residential area, Infrastructure

Ochrona przeciwerozyjna

GEOBRUGG SUPERCOATING

Projektant

Remedy Geotechnics

Inne przedsiębiorstwa

iBEX technical access

Osoba kontaktowa na miejscu

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Country Manager Ost- und Zentralschweiz, Liechtenstein

Formularz kontaktowy

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Szwajcaria Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Formularz kontaktowy

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Zagrożeniami naturalnymi
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Szwajcaria Project Manager Inspection Services

Formularz kontaktowy

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Zagrożeniami naturalnymi
Nżynieria hydrauliczna
Kopalnie / Wydobycie / Tunel
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Szwajcaria Ticino Country Manager

Formularz kontaktowy