边坡稳定 - Cwmavon Landslide 2018

Completed site image from the south of site.

边坡稳定 - Cwmavon Landslide 2018

Slope after failure and cleaning

边坡稳定 - Cwmavon Landslide 2018

Site after tree clearance

边坡稳定 - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

边坡稳定 - Cwmavon Landslide 2018

Skid drill rig installing soil nails

边坡稳定 - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

边坡稳定 - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

边坡稳定 - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

边坡稳定 - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

安装年份

2018

情况

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

地質學

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

描述

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

客户

Neath Port Talbot county borough council

承包商

Quantum Geotechnical

防护对象

Road, Residential area, Infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

工程

Remedy Geotechnics

分包商

iBEX technical access

本地联系方式

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / 美国 Regional Manager Northeast

联系地址

Saleh Feidi
 

Saleh Feidi

Regional Manager California

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / 美国 Regional Manager California

联系地址

John Kalejta
 

John Kalejta

Regional Manager Central US

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / 美国 Regional Manager Central US

联系地址

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

自然災害防護
Hydraulic Engineering
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / 美国 Regional Manager Southeast

联系地址

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

自然災害防護
Geobrugg North America, LLC,22 Centro Algodones , Civil Engineer General Manager Geobrugg North America

联系地址

Tim Shevlin
 

Tim Shevlin

Sales Director

自然災害防護
Geobrugg North America, LLC,Salem OR 97302 / 美国 Sales Director

联系地址