瑞士
瑞士

myGeobrugg

ATTENUATOR: Redirect and guide rockfall efficiently

The ATTENUATOR System is a modified rockfall drape providing particularly efficient protection. The upper part deflects the falling rock and the drape directs the rock to the designated runout zone. This low-maintenance protection solution is used where high-frequency rockfall events are expected.

Geobrugg Attenuators are easily dimensioned with the free online tool ATTERO.

Easy dimensioning with ATTERO

Tested in large-scale field tests the ATTENUATOR is the first solution of its kind that can be efficiently dimensioned. This is done with the free online tool ATTERO.

弹性和耐久性

The flexibility of the system ensures safety even after several impacts.

高强度钢丝网

Protection against dynamic and point loads: Optimum impact load distribution to the flexible high-tensile steel mesh and anchors prevents puncturing and system failure.

自卸荷

Redirected rockfall is safely guided into the runout zone, allowing the rocks to be removed quickly in an area of easy access thus reducing costs.

视频

Geobrugg ATTENUATOR development

参考资料

该项目
Bannholz

Rüthi SG, 瑞士

 

系统

ATT-60

 

安装年份

2023

该项目
Saint Beat (Haute Garonne)

Saint Béat, 法国

 

系统

ATT-60

 

安装年份

2020

该项目
Kaikoura State Highway 1 (SR14)

Kaikoura SH1, 新西兰

 

系统

RXE-2000
ATTENUATOR Customized

 

安装年份

2017

该项目
Kaikōura SH1 - SR8 and 9

Kaikōura, 新西兰

 

系统

ATT-60

 

安装年份

2021

该项目
Stanwell Park, Railway Corridor, 2020

Stanwell Park New South Wales, 澳大利亚

 

系统

Rockfall drape
ATTENUATOR Customized

 

安装年份

2020

该项目
Kanmantoo Copper Mine

Kanmantoo, 澳大利亚

 

系统

T35
Rockfall drape
RXE-3000
TECCO® G65/4
SPIDER®
DELTAX®
MINAX® 80/3
DELTAX® G80/2
ATT-60

 

安装年份

2019

该项目
Clackamas Highway, Oregon, OR224

Estacada, Oregon, 美国

 

系统

ATT-40

 

安装年份

2015

该项目
Canadian Malartic Mine CMM

Malartic, 加拿大

 

系统

TECCO® G65/3
ATT-30

 

安装年份

2019

该项目
Alishan, Chiayi County

Chiayi County, 台湾

 

系统

ATTENUATOR Customized

 

安装年份

2018

该项目
South African Open Pit Mine

N/A, 南非

 

系统

ATT-30

 

安装年份

2018

该项目
Kelowna

West Kelowna, BC, 加拿大

 

系统

ATT-60

 

系统长度

20 m

 

安装年份

2017

联系我们

René Müller
     

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Olivia Sartorius
     

Olivia Sartorius

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Isacco Toffoletto
     

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道