美国
美国

Canadian Malartic Mine CMM

Malartic, 加拿大
2019
工程
CMM advised by Geobrugg
防护对象
Mine / Quarry
系统的高度
4.0 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
边坡稳定, 泥石流和滑坡防护, 矿井/隧道
情况

The Canadian Malartic mine is one of Canada's (CMM) largest gold mines. CMM is committed to constantly conducting its operations in a way that ensures a healthy and safe work environment. Potential rockfall hazards led CMM to contact Geobrugg for advice on mitigation solutions. Geobrugg worked with CMM on selecting the attenuator system solution as the most efficient and cost-effective solution for the open pit.

描述

Geobrugg worked closely with the mine and with Construction & Expertise PG as the installation contractor to manage the rockfall hazards. To date, approximately 33,000m² of TECCO® for about 450 meters of attenuator have been installed. During the installation of the attenuator, all the mining activities were conducted normally without interruption.

Our pictures show attenuators solutions at The Canadian Malartic Mine.

本地联系方式

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
自然災害防護
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / 美国
Saleh Feidi
Saleh Feidi
Regional Manager California
自然災害防護
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / 美国
John Kalejta
John Kalejta
Regional Manager Central US
自然災害防護
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / 美国
Bob Lyne
Bob Lyne
Regional Manager Southeast
自然災害防護
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / 美国
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
自然災害防護
Geobrugg North America, LLC
22 Centro Algodones
Tim Shevlin
Tim Shevlin
Sales Director
自然災害防護
Geobrugg North America, LLC
Salem OR 97302 / 美国