瑞士
瑞士

myGeobrugg

落石防护 - Bannholz 2023

Detail view from the upper part of the attenuator

落石防护 - Bannholz 2023

The stones are stopped and then fall down behind the mesh in a controlled manner.

落石防护 - Bannholz 2023

The secured Brunnenberg road with the ATT-60

落石防护 - Bannholz 2023

The attenuator protects the road from falling rocks from the rock face and the forest

落石防护 - Bannholz 2023

Overview of the project area

 

系统

 

系统长度

42 m

 

安装年份

2023

情况

The road section of Brunnenbergstrasse is lined on the mountain side by steep rock faces. Rocks have to be cleared from the road regularly, especially in spring and summer. 

描述

Due to the tight space between the rock face and the road, and for cost reasons, the engineer and the client opted for an attenuator solution. Individual stones, which will continue to come loose in the future, fall to the edge of the road at the foot of the rock face. This prevents damage to people or the road. Escaping water can flow off without any problems.

客户

Politische Gemeinde Rüthi SG

防护对象

Road, Touristic infrastructure

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士

联系地址