スイス
スイス

myGeobrugg

 - Bannholz 2023

Detail view from the upper part of the attenuator

 - Bannholz 2023

The stones are stopped and then fall down behind the mesh in a controlled manner.

 - Bannholz 2023

The secured Brunnenberg road with the ATT-60

 - Bannholz 2023

The attenuator protects the road from falling rocks from the rock face and the forest

 - Bannholz 2023

Overview of the project area

 

システム

 

システム延長

42 m

 

設置年

2023

状況

The road section of Brunnenbergstrasse is lined on the mountain side by steep rock faces. Rocks have to be cleared from the road regularly, especially in spring and summer. 

説明

Due to the tight space between the rock face and the road, and for cost reasons, the engineer and the client opted for an attenuator solution. Individual stones, which will continue to come loose in the future, fall to the edge of the road at the foot of the rock face. This prevents damage to people or the road. Escaping water can flow off without any problems.

顧客名

Politische Gemeinde Rüthi SG

エンジニアリング

保護対象

道路, 観光用インフラ

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス

お問い合わせフォーム