瑞士
瑞士

South African Open Pit Mine

N/A, N/A, 南非
2018
客户
Undisclosed Mine
工程
Geobrugg
承包商
Marshall Development
防护对象
Road, Mine / Quarry
能级
500 kJ
系统的高度
3.0 m
系统长度
20 m
腐蚀保护
GEOBRUGG SUPERCOATING
其他安装的应用程序
矿井/隧道
情况

The open-pit mine is located in the Republic of South Africa. The life of mine (LOM) is planned to the end of 2021. Two ore bodies will be mined at a combined rate of 5.9 Mtpa, using sub-level cave mining techniques. The resulting ground subsidence will affect operations at the surface.

Therefore, the customer required the installation of ground support and rockfall protection systems to improve the safety of people, of machines and equipment.

描述

Based on attenuator 1:1 testing in 2017, a system was designed based on calculated impulse. The impulse decided on the chosen type of attenuator. The rotational component defined the mesh type.

Rockfall attenuators are an exciting new protection system, especially for open-pit mines. They are a protection solution combining rockfall drapes and flexible rockfall barriers. The system is a passive protection measure: The barrier intercepts the falling rocks, the drape guides them into the designated runout zone.

  • Post height: 3 meters
  • System width: 20 meters
  • Mesh length: 50 meters

本地联系方式

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
自然災害防護, Coastal Erosion Protection, 矿井/隧道
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / 瑞士
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
自然災害防護, 矿井/隧道
Geobrugg AG
Industriestrasse 21
5200 Brugg / 瑞士
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
自然災害防護, 矿井/隧道
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / 瑞士