Estados Unidos
Estados Unidos

myGeobrugg

ATTENUATOR: Redirect and guide rockfall efficiently

The ATTENUATOR System is a modified rockfall drape providing particularly efficient protection. The upper part deflects the falling rock and the drape directs the rock to the designated runout zone. This low-maintenance protection solution is used where high-frequency rockfall events are expected.

Geobrugg Attenuators are easily dimensioned with the free online tool ATTERO.

Dimensionamento fácil com ATTERO

Tested in large-scale field tests the ATTENUATOR is the first solution of its kind that can be efficiently dimensioned. This is done with the free online tool ATTERO.

Resistente e duradouro

The flexibility of the system ensures safety even after several impacts.

Malha de fio de aço de alta resistência à tracção

Protection against dynamic and point loads: Optimum impact load distribution to the flexible high-tensile steel mesh and anchors prevents puncturing and system failure.

Efeito auto-limpeza

Redirected rockfall is safely guided into the runout zone, allowing the rocks to be removed quickly in an area of easy access thus reducing costs.

Videos

Geobrugg ATTENUATOR development

Referências

O projeto
Bannholz

Rüthi SG, Suíça

 

Sistemas

ATT-60

 

Ano de instalação

2023

O projeto
Saint Beat (Haute Garonne)

Saint Béat, França

 

Sistemas

ATT-60

 

Ano de instalação

2020

O projeto
Kaikoura State Highway 1 (SR14)

Kaikoura SH1, New Zealand

 

Sistemas

RXE-2000
ATTENUATOR Customized

 

Ano de instalação

2017

O projeto
Kaikōura SH1 - SR8 and 9

Kaikōura, New Zealand

 

Sistemas

ATT-60

 

Ano de instalação

2021

O projeto
Stanwell Park, Railway Corridor, 2020

Stanwell Park New South Wales, Austrália

 

Sistemas

Rockfall drape
ATTENUATOR Customized

 

Ano de instalação

2020

O projeto
Mina de cobre Kanmantoo

Kanmantoo, Austrália

 

Sistemas

T35
Rockfall drape
RXE-3000
TECCO® G65/4
SPIDER®
DELTAX®
MINAX® 80/3
DELTAX® G80/2
ATT-60

 

Ano de instalação

2019

O projeto
Clackamas Highway, Oregon, OR224

Estacada, Oregon, Estados Unidos

 

Sistemas

ATT-40

 

Ano de instalação

2015

O projeto
Canadian Malartic Mine CMM

Malartic, Canadá

 

Sistemas

TECCO® G65/3
ATT-30

 

Ano de instalação

2019

O projeto
Alishan, Chiayi County

Chiayi County, Taiwan

 

Sistemas

ATTENUATOR Customized

 

Ano de instalação

2018

O projeto
South African Open Pit Mine

N/A, África do Sul

 

Sistemas

ATT-30

 

Ano de instalação

2018

O projeto
Kelowna

West Kelowna, BC, Canadá

 

Sistemas

ATT-60

 

Comprimento do sistema

20 m

 

Ano de instalação

2017

Contactos

Kevin Coyle
   

Kevin Coyle

Regional Manager Northeast

Riscos naturais
Engenharia Hidráulica
Saleh Feidi
   

Saleh Feidi

Riscos naturais
Engenharia Hidráulica
John Kalejta
   

John Kalejta

Riscos naturais
Engenharia Hidráulica
Bob Lyne
   

Bob Lyne

Riscos naturais
Engenharia Hidráulica
Pierce Runnels, Civil Engineer
     

Pierce Runnels, Civil Engineer

General Manager Geobrugg North America

Riscos naturais
Pierce Runnels
   

Pierce Runnels

Riscos naturais
Tim Shevlin
   

Tim Shevlin

Riscos naturais