Suíça
Suíça

myGeobrugg

Steel wire mesh for sustainable protection against rodents and burrowing animals

Animals such as beavers, wild boars, foxes, and badgers can damage infrastructure such as earth dams, dikes, and irrigation canals. The damage can trigger dam failures, flooding and drain water reservoirs.

Burrowing activities on road verges can lead to road surface erosion and collapse. The burrow and rodent protection is based on high-strength steel wire mesh which is a sustainable, cost-effective and comparatively less invasive measure to maintain infrastructure and ensure animal welfare.

High-strength steel resists the sharp teeth of rodents. Other animals, such as wild boar or foxes, are deterred from digging by the steel wire mesh. Depending on the protective function, finer or stronger mesh is recommended; combinations are also possible.

SUPERCOATING or ULTRACOATING are used in most applications, with the option of stainless steel to offer maximum corrosion protection and durable solutions on road embankments or coasts with higher salinity environments.  

Embedded in nature

The mesh is inconspicuous and is usually hidden by vegetation.

Simple assembly

The lightweight mesh is easy to transport, unroll and lay.

Rodent and burrowing protection

Depending on the protective function, the mesh size varies; multiple protection can be easily implemented.

Tested many times

All our meshes are tested and can withstand rodent teeth and burrowing animals thanks to the high-strength steel.

Recyclable and free from plastic

The steel mesh can be completely recycled. It is free from plastic: no pollutant discharge into groundwater or when eaten by animals.

Videos

TECCO® CELL at Beesands by Shore Defence Ltd
TECOO System Slope Stabilization

Referências

O projeto
Mauren

Mauren, Liechtenstein

 

Sistemas

TECCO® G45/2

 

Ano de instalação

2017

O projeto
Meckenbeuren dam protection against badger

Meckenbeuren, Alemanha

 

Sistemas

TECCO® G45/2

 

Ano de instalação

2022

O projeto
Grüner See - Schmiedewalde

Klipphausen/Schmiedewalde, Kreis Meissen, Alemanha

 

Sistemas

TECCO® GREEN G65/3

 

Ano de instalação

2016

O projeto
Bear Sanctuary Arosa

Arosa, Suíça

 

Sistemas

 

Ano de instalação

2018

O projeto
Spergau - dam protection against badger

Spergau, Alemanha

 

Sistemas

TECCO® G65/3

 

Ano de instalação

2024

Contactos

René Müller
     

René Müller

Country Manager Western Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Olivia Sartorius
     

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis
Isacco Toffoletto
     

Isacco Toffoletto

Country Manager Southern Switzerland

Riscos naturais
Engenharia Hidráulica
Mineração / Túneis