Schweiz
Schweiz

myGeobrugg

Böschungsstabilisierung - Stromeferry Railway Station 2021

Railway protection with TECCO mesh

Böschungsstabilisierung - Stromeferry Railway Station 2021

TECCO on rock slope

 
 

Installationsjahr

2021

Ausgangslage

Several rock blocks had fallen into the cess, the largest of which was 1.8 x 1.0 x 0.7 cubic meters. After inspection, a length of 80 meters was found to have the potential for failure.
The designer needed a strong solution, which was quick to design and rapidly available for emergency repairs.

Geologie

Lewisian Gneiss

Massnahme

We supplied TECCO G65/3 on short notice to a remote site in the Highlands. While working with the designer in the background, we ensured they had all the necessary technical data for their design.

Kunde

Network Rail

Ausführende Firma

Scots Rope Access

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Ansprechpartner

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Stabile Cometal, via Pizzante 7,6595 Riazzino / Schweiz Ticino Country Manager

E-Mail