USA
USA

myGeobrugg

Tramway du Mont Blanc - Nid d'Aigle

Steinschlagschutz - Tramway du Mont Blanc - Nid d'Aigle 2022

Canopy system protecting the railway

Steinschlagschutz - Tramway du Mont Blanc - Nid d'Aigle 2022

Vue latérale de l'ouvrage

 

Systeme

 

Systemlänge

70 m

 

Installationsjahr

2022

Ausgangslage

At the tunnel entrance, just before the Nid d'Aigle arrival station, the Mont Blanc Tramway passes the foot of a cliff subject to rock falls. 

Massnahme

The installation of a CANOPY deflector structure (self-cleaning up to 500 kJ) on a 70 meters long line, in addition to a wire mesh placed on the lower part of the rockface, allowed to secure the site.

Ausführende Firma

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail