USA
USA

myGeobrugg

S7 Express Road Lubien bypass slope stabilization

Böschungsstabilisierung - S7 Express Road Lubien bypass slope stabilization 2009

Rockface stabilized with SPIDER® net

Böschungsstabilisierung - S7 Express Road Lubien bypass slope stabilization 2009

Holding back rock blocks

Böschungsstabilisierung - S7 Express Road Lubien bypass slope stabilization 2009

Not only road protection: also protecting this statue of a saint

Böschungsstabilisierung - S7 Express Road Lubien bypass slope stabilization 2009

Protected road

 

Installationsjahr

2009

Ausgangslage

-

Massnahme

High water flows.

Kunde

National Road dept. Warsaw / GDDKiA Warszawa

Ausführende Firma

IMB Podbeskidzie Sp. z o.o.

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Andrzej Kulawik Engineering Office

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail