Debris Flow & Shallow Landslide Protection - Borusan EnBW 2019

18 meters top width require strong GEOBINEX ropes

Debris Flow & Shallow Landslide Protection - Borusan EnBW 2019

8 meters long wire rope anchors placed in 92 mm bore holes - anchoring in solid rock is required to resist the enormous forces of debris and mudflows

Debris Flow & Shallow Landslide Protection - Borusan EnBW 2019

Final control of the VX160-H6 ringnet barrier

 

Systems

 

System length

15 m

 

Year of installation

2019

Initial situation

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Description

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Country/Region

Türkiye

Customer

Borusan EnBW

Engineering

Geobrugg AG

Contractor

Artusa Geohazard

Protected object

Other

Corrosion protection

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Natural Hazards
Hydraulic Engineering
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland , Msc. Env. Eng.

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Monitoring
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / Switzerland Country Manager Southern Switzerland

E-Mail