泥石流和滑坡防护 - Borusan EnBW 2019

18 meters top width require strong GEOBINEX ropes

泥石流和滑坡防护 - Borusan EnBW 2019

8 meters long wire rope anchors placed in 92 mm bore holes - anchoring in solid rock is required to resist the enormous forces of debris and mudflows

泥石流和滑坡防护 - Borusan EnBW 2019

Final control of the VX160-H6 ringnet barrier

 

系统

 

系统长度

15 m

 

安装年份

2019

情况

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

描述

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

国家/地区

土耳其

客户

Borusan EnBW

工程

Geobrugg AG

承包商

Artusa Geohazard

防护对象

Other

腐蚀保护

GEOBRUGG SUPERCOATING

本地联系方式

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Western Switzerland

联系地址

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Project Manager Sales Eastern Switzerland

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Monitoring
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 瑞士 Country Manager Southern Switzerland

联系地址