スイス
スイス

myGeobrugg

 - Borusan EnBW 2019

18 meters top width require strong GEOBINEX ropes

 - Borusan EnBW 2019

8 meters long wire rope anchors placed in 92 mm bore holes - anchoring in solid rock is required to resist the enormous forces of debris and mudflows

 - Borusan EnBW 2019

Final control of the VX160-H6 ringnet barrier

 

システム

 

システム延長

15 m

 

設置年

2019

状況

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

説明

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

国名

トルコ

顧客名

Borusan EnBW

エンジニアリング

Geobrugg AG

落札者

Artusa Geohazard

保護対象

その他

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム