토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

18 meters top width require strong GEOBINEX ropes

토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

8 meters long wire rope anchors placed in 92 mm bore holes - anchoring in solid rock is required to resist the enormous forces of debris and mudflows

토석류 및 산사태 방호 시스템 - Borusan EnBW 2019

Final control of the VX160-H6 ringnet barrier

 

Systems

 

시스템 길이

15 m

 

설치 년도

2019

Situation

At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system.  Around 5'000 m³ of debris damaged the HPP area.

Description

At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.

Country/Region

터키

Customer

Borusan EnBW

Engineering

Geobrugg AG

Contractor

Artusa Geohazard

Protected object

Other

부식방지

GEOBRUGG SUPERCOATING

Your local contact

René Müller
   

René Müller

Country Manager Western Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG,Industriestrasse 21,5200 Brugg / 스위스 Country Manager Western Switzerland

이메일

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Project Manager Sales Eastern Switzerland

이메일

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

자연 재해
모니터링
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / 스위스 Project Manager Inspection Services

이메일

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

자연 재해
수리학
광산 / 터널
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / 스위스 Country Manager Southern Switzerland

이메일