At the hydro power plant infrastructure in 2011 and 2017 torrents brought down debris and clogged culverts of the draining system. Around 5'000 m³ of debris damaged the HPP area.
At the ideal place for this debris flow barrier, there also is an area for debris material nearby. The system is a V-shaped, 6 meters high barrier (VX160-H6) with 8 meters deep wire rope anchors.