MINAX® 80/4

MINAX® 80/4: Most economical to support rock bursting tunnels

MINAX® 80/4 mesh is the perfect solution for highly stressed tunnel profiles subject to the risk of rock squeeze and bursting, as a replacement or extension of shotcrete, fibercrete or mesh in conjunction with cable lacing. In particular for dynamic surfaces, it provides an extremely attractive cost-performance ratio.

Tests conducted by the Western Australian School of Mines (WASM) have shown that high-tensile MINAX® mesh with a wire tensile strength of at least 1,770 N/mm2 is able to withstand substantially higher static and dynamic loads than conventional reinforcement nets. This also enables higher levels of rockburst energy to be absorbed.

High-tensile steel wire

For high load capacity: Both static and dynamic capacities (e.g. while blasting) are higher compared to other surface support meshes/nets.

Balanced Stiffness

Very high load capacities (both static and dynamic) with optimal deformations, not endangering tunnel clearance.

Rhomboidal chain-link structure

For easy handling and storing: Manual and mechanized installation by unrolling with any mechanized technology.

Lightweight

For fast installation: Very light relative to its strength due to the high-tensile wire. This makes manual or mechanical installation very easy and improves the occupational health and safety.

KNOTTED ENDS

For maximum stability at the edges: Take advantage of minimized overlap, optimized number of rock bolts, and no sharp edges.

Cutting edge corrosion protection

Whether hot dip galvanized, SUPERCOATING®, stainless steel: After our analysis of the environmental conditions in your mine, we offer the corrosion protection solution, according to your specific needs.

Videos

References

To the project
Codelco El Teniente Copper Mine

Sewell, Rancagua, Chile

 

Systems

MESHA®
MINAX® 80/4
MINAX® 65/4

 

Year of installation

2016

To the project
Quellaveco mine

Peru - Moquegua – Quellaveco, Peru

 

Systems

MINAX® 80/4
Rockfall drape

 

Year of installation

2023

To the project
Hydropowerplant Chile II

San Jose de Maipo RM, Chile

 

Systems

MINAX® 80/4
MESHA®

 

Year of installation

2016

To the project
Hydroelectric Power Plant Tunnel

-, Peru

 

Systems

MINAX® 80/4
MESHA®

 

Year of installation

2014