Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Completed section of the SL-150 shallow landslide barrier protecting school access road and houses in Mytholmroyd

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

The road closed after the landfill land slip in 2015

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Signs of creeping tension cracks located at the top of the slope

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Another view of the tension cracks

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Geobrugg engineers assisting with the SL-150 shallow landslide barrier line stake-out

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Geobrugg engineers were on site to advise at all key milestones of the project - here to advise on the installation of the posts

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

Secondary mesh being attached to the SL-150 shallow landslide barrier

Hangmuren- und Murgangschutz - Scout Road in Mytholmroyd 2016

View of the almost completed SL-150 shallow land slip barrier

 

Systeme

 

Systemlänge

232 m - 232 m

 

Installationsjahr

2016

Ausgangslage

During heavy storms over the Christmas holiday period 2015 a section of slope failed and slid onto Scout Road.  The road is a key access point to a local school which it was important to open as soon as possible.  Geobrugg were called to site to advise on possible solutions to protect the road so the school could be reopened.  After examining the site Geobrugg recommended SL-150 landslide barrier be placed underneath the affected area.

Following further inspection works pre-construction tension cracks were noted at the top of the slope covering approximatly 175 [m] of the slope, the section that failed was only aproximately 40 [in] width.  So it was decided the barrier should cover the entire length to mitigate against further possible landslides.

Massnahme

The client's preferred contractor mobilised to site to start site clearance ahead of installing the barrier during site clearance it was noted that the failed section of slope was an old landfill area containing asbestos and not natural soils. 

With the assistance of Geobrugg engineers the fence line was set out at a length of 232 [m] with a post separation of 6 [m]. To accommodate local topography some post spacings were adjusted and an upslope direction change was marked out. 

Geobrugg engineers were on hand throughout the construction phase to assist with the installation as the contractor had never built a barrier before. The project was completed fall 2016 and the client is happy with the barrier which is the first they have had installed.

Kunde

Calderdale Council

Planer

JBA Consulting Ltd.

Ausführende Firma

DHRA Geotechnical Ltd.

Geschützte Objekte

Strasse

Korrosionsschutz

Verzinkt, GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz

E-Mail