Böschungsstabilisierung - Schmerikon State Road 17 2013

Bird's eye view of the protected objects: State roadway, railway, bicycle path, building and port

Böschungsstabilisierung - Schmerikon State Road 17 2013

Slope failure seen shortly after the emergency work began a few days after the incident in June 2013

Böschungsstabilisierung - Schmerikon State Road 17 2013

Spider excavator during drilling

Böschungsstabilisierung - Schmerikon State Road 17 2013

Drilling along the top edge of the failed slope

Böschungsstabilisierung - Schmerikon State Road 17 2013

Drilling with manual equipment

Böschungsstabilisierung - Schmerikon State Road 17 2013

View of the upper section showing nailed TECCO G65/3, P33 spike plates and border rope

Böschungsstabilisierung - Schmerikon State Road 17 2013

Lage: Zürichsee, Schweiz Bundesamt für Landestopographie, Bern, Schweiz Landeskarte 1:50'000

 
 

Installationsjahr

2013

Ausgangslage

In the first days of June 2013 heavy storms and intense rainfall hit the region of the upper lake of Zurich. Due to saturation of the ground and instable geological conditions, a landslide buried a long section of heavily travelled commuter roadway and railway along the lake. This landslide caused complete closure of the infrastructure.

Geologie

Top Section: weathered marl

Bottom section: weathered sandstone / siltstone

Massnahme

The department for underground construction initiated re-establishment and sustainable prevention of future similar incidents a few days later. To reach a quick decision and accelerate the construction, the department quickly involved local and regional partners.

Solutions discussed were rockfall barrier, manifold, or anchored TECCO® System the most favorable and ultimately chosen solution.

The upper slope section (marl) was protected and stabilized using a nailed mesh. The lower sandstone/siltstone section was covered with a drape to ensure that falling debris is kept close to the slope while being guided and deposited to the ditch.

Kunde

Kantonales Tiefbauamt, Kanton St.Gallen, Switzerland

Ausführende Firma

Oberholzer Bauleistungen Inc., Neuhaus, Switzerland

Geschützte Objekte

Strasse, Eisenbahn, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Dr.A.Gübeli Inc., Jona, Switzerland

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail