Hangmuren- und Murgangschutz - RD242 Miribel-Lanchâtre 2023

VX140 upstream barrier with view of the village of St Guillaume and the Trièves mountains

Hangmuren- und Murgangschutz - RD242 Miribel-Lanchâtre 2023

Event on 10 November 2022 that reached the road

Hangmuren- und Murgangschutz - RD242 Miribel-Lanchâtre 2023

Aerial view of the solution implemented with erosion protection mat at the top, VX140 then VX080 barrier on the way down

Hangmuren- und Murgangschutz - RD242 Miribel-Lanchâtre 2023

VX140 barrier, height 4 meters with angle to protect the upper edge cables from damage

Hangmuren- und Murgangschutz - RD242 Miribel-Lanchâtre 2023

VX080 barrier, 4 meters high, sized to take the overflow from the upstream VX140 barrier

 

Systemlänge

12 m - 15 m

 

Installationsjahr

2023

Ausgangslage

A landslide with a volume of around 700 m³ started in 2018 in the upper part of a talweg upstream of the Road (RD242), due to the action of significant hydraulic inputs.

Since then, during each period of bad weather, debris has been carried into the talweg. In December 2022  200 m³ were spilled onto the road.

The road remained under constant threat of further flooding during bad weather.

Massnahme

The upper area was stabilized with TECCO GREEN flexible facing and spike plates.

A VX140 barrier 4 m high provides the first level of retention, with an estimated retention volume of 225 m³.

A few dozen meters downstream, a second VX080 barrier will absorb the excess volume that has passed over the upstream barrier.

Land/Region

Frankreich

Kunde

Grenoble Alpes Métropole

Planer

Ausführende Firma

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Fernüberwachung
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail