myGeobrugg
2018
Due to surface slides, the slope at the Madden highway became part of Panama's 2018 mitigation plan.
Deep soil layer over weathered rock
Installation of TECCO® G45/2 system with nails of 4 m length and nail separation 3.75 x 3.75 m.
Panama
Concesionaria Madden Colon (CMC)
Louis Berger
Concesionaria Madden Colon (CMC)
Geointer Panama PROGEO Inc. IDM Ingenieria y Cosntrucción S.A.
Strasse
GEOBRUGG SUPERCOATING