myGeobrugg
2022
Slope stabilization was necessary at the Perez Caldera mining camp. These slopes are on the side of a road that pedestrians and light vehicles use.
The solution defined was installing TECCO GREEN - a mesh system with an erosion control mat- to stabilize, minimize the environmental impact, avoid using shotcrete and allow the revegetation of the slopes.
Climbers
Strasse, Gebäude, Infrastruktur
Verzinkt, GEOBRUGG SUPERCOATING