Steinschlagschutz
Ausgangslage

The 9 de Julio thermal power plant is located in an old quarry, which emerged when rocks for the construction of the breakwaters of the city were extracted. The blasting of the rock left vertical slopes with a height of 20 meters - they show continuous rockfalls. A few meters from these slopes, there is a gas pipeline and a fuel oil pipeline feeding the boiler of this plant.

Geologie

Fragmented sandstone. 

Massnahme

After several rockfalls events and with the aim of preserving the integrity of these gas and fuel oil pipelines, a protection system was implemented. The closest 30 linear meters of slope to these pipelines were intervened, installing a drape system.

Ansprechpartner

Kevin H. Coyle
Kevin H. Coyle
Regional Manager Northeast
Naturgefahren, Uferschutz
Geobrugg North America, LLC
3 Beaudet Terr
Columbia CT 06237 / USA
Saleh Feidi
Saleh Feidi
Regional Manager California
Naturgefahren, Uferschutz
Geobrugg North America, LLC
8921 Emperor Ave.
San Gabriel, California 91775 / USA
John Kalejta
John Kalejta
Regional Manager Central US
Naturgefahren, Uferschutz
Geobrugg North America, LLC
3215 67th Avenue Pl
Greeley CO 80634 / USA
Bob Lyne
Bob Lyne
Regional Manager Southeast
Naturgefahren, Uferschutz
Geobrugg North America, LLC
8004 Windspray Drive
Summerfield NC 27358 / USA
Pierce Runnels, Civil Engineer
Pierce Runnels, Civil Engineer
General Manager Geobrugg North America
Naturgefahren
Geobrugg North America, LLC
22 Centro Algodones
NM 87001 Algodones / USA
Tim Shevlin
Tim Shevlin
Sales Director
Naturgefahren
Geobrugg North America, LLC
Salem OR 97302 / USA