Schweiz
Schweiz

myGeobrugg

Steinschlagschutz - Hydropowerplant Chile I 2016

The barrier and the protected area

Steinschlagschutz - Hydropowerplant Chile I 2016

During installation

Steinschlagschutz - Hydropowerplant Chile I 2016

Final installation works

Steinschlagschutz - Hydropowerplant Chile I 2016

Final installation works

Steinschlagschutz - Hydropowerplant Chile I 2016

View on the protected tunnel entrance

Steinschlagschutz - Hydropowerplant Chile I 2016

Lateral view on the RXE-1000 barrier

Steinschlagschutz - Hydropowerplant Chile I 2016

Protected area, barrier in the background

 

Systeme

 

Systemlänge

120 m

 

Installationsjahr

2016

Ausgangslage

In the area of the portal of the VA2 tunnel of the Alto Maipo project, rockfalls caused damage to the surrounding infrastructure and interruptions in operations. It was urgently necessary to find a solution that would allow working in a safe manner.

Massnahme

To retain rocks up to 1000 kJ of energy, Geobrugg proposed the construction of an RXE-1000 rockfall barrier with the following characteristics.

  •     Height:5 meters
  •     Post spacing: 10 meters
  •     Anchors to the mount: 4 meters long
  •     Anchors in the plate, subjected to compression: 4 meters
  •     Anchors in the plate, subjected to traction: 3 meters
  •     Anchors edge: 5 meters
  •     120 linear meters

Engineering and placement of the barriers were carried out by Swiss company Geotest.

Land/Region

Chile

Kunde

Proyecto hidroelectrico Alto Maipo

Planer

Geotest

Ausführende Firma

Incolur

Geschützte Objekte

Gebäude, Steinbruch / Bergbau, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Fernüberwachung
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail