USA
USA

myGeobrugg

Hemlo Mine

Barrick Hemlo Mine, P0T, Hemlo, Ontario, Kanada
2020
Planer
BARRICK/ Advised by GeoStabilization International (GSI) and Geobrugg N. A. LLC
Geschützte Objekte
Steinbruch / Bergbau, Infrastruktur
Korrosionsschutz
GEOBRUGG SUPERCOATING
Weitere verbaute Anwendungen
Steinschlagschutz, Böschungsstabilisierung, Minen und Bergbau
Ausgangslage

Hemlo has produced more than 21 million ounces of gold and has been operating continuously for more than 30 years. It consists of the Williams mine — an underground and open pit operation — located about 350 kilometers east of Thunder Bay, Ontario. Potential rockfall hazards at the tunnel portal led the mine to contact Geobrugg NA LLC. for advice on mitigation solutions.

GeoStabilization International (GSI) chose an attenuator solution as the most efficient and cost-effective for open pit mining.

Massnahme

Geobrugg worked closely with the mine and the installation contractor GeoStabilization International (GSI) to manage the rockfall hazards. 

The works consist of:

  • two attenuators totaling 70 meters of MINAX® 80/4 mesh
  • one GBE-1000A-R kJ barrier
  • one anchored TECCO® G65/3 mesh system.

During the installation of the different solutions, all mining activities continued with no interruption.

Ansprechpartner

Erik Rorem
Erik Rorem
Business Development Manager Geobrugg North America
Minen / Bergbau / Tunnel
Geobrugg North America, LLC
22 Centro Algodones
NM 87001 Algodones / USA
Dane Wagner
Dane Wagner
Open Pit Mining / Quarries Business Development Manager
Minen / Bergbau / Tunnel
Geobrugg North America, LLC
10700 SW Beaverton Hillsdale Hwy, Suite #470-1
97005 Beaverton / USA