Швейцария
Швейцария

Hemlo Mine

Barrick Hemlo Mine, P0T, Hemlo, Ontario, Канада
2020
Клиент
Проектировщик
BARRICK/ Advised by GeoStabilization International (GSI) and Geobrugg N. A. LLC
Защищаемый объект
Kарьер / Шахта, Инфраструктура
Защита от коррозии
GEOBRUGG SUPERCOATING
Другие конструкции
Камнепады, обвалы, осыпи, Укрепление склонов, Горнодобывающая промышленность / Туннели
Ситуация

Hemlo has produced more than 21 million ounces of gold and has been operating continuously for more than 30 years. It consists of the Williams mine — an underground and open pit operation — located about 350 kilometers east of Thunder Bay, Ontario. Potential rockfall hazards at the tunnel portal led the mine to contact Geobrugg NA LLC. for advice on mitigation solutions.

GeoStabilization International (GSI) chose an attenuator solution as the most efficient and cost-effective for open pit mining.

Описание

Geobrugg worked closely with the mine and the installation contractor GeoStabilization International (GSI) to manage the rockfall hazards. 

The works consist of:

  • two attenuators totaling 70 meters of MINAX® 80/4 mesh
  • one GBE-1000A-R kJ barrier
  • one anchored TECCO® G65/3 mesh system.

During the installation of the different solutions, all mining activities continued with no interruption.

Представитель в Вашем регионе

Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Инженерная защита, Горнодобывающая промышленность / Туннели
Geobrugg AG Ticino
Stabile Cometal, via Pizzante 7
6595 Riazzino / Швейцария
Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Инженерная защита, берегоукрепление, Горнодобывающая промышленность / Туннели
Геобругг АГ
Аахштрассе 11
8590 Романсхорн / Швейцария
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Инженерная защита, Горнодобывающая промышленность / Туннели
Геобругг АГ
Industriestrasse 21
5200 Brugg / Швейцария