Underground & Open Pit Mining - Hemlo Mine 2020

The complete installation: the rockfall barrier in the background (middle), underneath the stabilized rockface (TECCO® mesh), two attenuators at the sides

Underground & Open Pit Mining - Hemlo Mine 2020

Interception part of one of the customized attenuators: the rigid posts permit the absence of retaining ropes, leaving the berm free to access, example for maintenance works.

 

Year of installation

2020

Initial situation

Hemlo has produced more than 21 million ounces of gold and has been operating continuously for more than 30 years. It consists of the Williams mine — an underground and open pit operation — located about 350 kilometers east of Thunder Bay, Ontario. Potential rockfall hazards at the tunnel portal led the mine to contact Geobrugg NA LLC. for advice on mitigation solutions.

GeoStabilization International (GSI) chose an attenuator solution as the most efficient and cost-effective for open pit mining.

Description

Geobrugg worked closely with the mine and the installation contractor GeoStabilization International (GSI) to manage the rockfall hazards. 

The works consist of:

  • two attenuators totaling 70 meters of MINAX® 80/4 mesh
  • one GBE-1000A-R kJ barrier
  • one anchored TECCO® G65/3 mesh system.

During the installation of the different solutions, all mining activities continued with no interruption.

Customer

Protected object

Mine / Quarry, Infrastructure

Corrosion protection

GEOBRUGG SUPERCOATING

Engineering

BARRICK/ Advised by GeoStabilization International (GSI) and Geobrugg N. A. LLC

Other installed applications

Rockfall Protection, Slope Stability, Underground & Open Pit Mining

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail