USA
USA

myGeobrugg

Minen und Bergbau - Hellas Gold 2019

Debris flow barrier after installation, complete with abrasion protection and winglets

Minen und Bergbau - Hellas Gold 2019

Before placing the anchors in concrete

Minen und Bergbau - Hellas Gold 2019

Setting up the posts and fastening the pre-assembled ring net

Minen und Bergbau - Hellas Gold 2019

Nearly finished - winglets and abrasion protection are next to come

 

Systeme

 

Installationsjahr

2019

Ausgangslage

At the Hellas Gold mine, protection from debris flow had become necessary in phase 1 (2019 - 2027) area.

Massnahme

Installation of a 4 meters high, u-shaped ring net debris flow barrier

Land/Region

Griechenland

Kunde

Hellas Gold

Geschützte Objekte

Steinbruch / Bergbau, Sonstige

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

John Kalejta
 

John Kalejta

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,KS 67226 Wichita / USA

E-Mail

Bob Lyne
 

Bob Lyne

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Geobrugg North America, LLC,OR 97302 Salem / USA

E-Mail