Böschungsstabilisierung - Cwmavon Landslide 2018

Completed site image from the south of site.

Böschungsstabilisierung - Cwmavon Landslide 2018

Slope after failure and cleaning

Böschungsstabilisierung - Cwmavon Landslide 2018

Site after tree clearance

Böschungsstabilisierung - Cwmavon Landslide 2018

Installation from top down of TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Skid drill rig installing soil nails

Böschungsstabilisierung - Cwmavon Landslide 2018

View of the full site including mobile elevated work platform (MEWP)

Böschungsstabilisierung - Cwmavon Landslide 2018

Image from the north of site, showing the contouring of the mesh

Böschungsstabilisierung - Cwmavon Landslide 2018

Natural vegetation regrowth through the TECCO® GREEN

Böschungsstabilisierung - Cwmavon Landslide 2018

Boundary ropes and vegetation growth

 

Installationsjahr

2018

Ausgangslage

After prolonged periods of heavy rain and strong winds a large quantity of material was mobilised from the slope down onto the B4286. The road was closed for safety concerns whilst any remaining material was removed by hand. Traffic management was then installed and the road was re-opened as a single lane under traffic management.

Working closely with the local borough council, Geotechnical contractor Quantum Geotechnical and specialist rope access teams at iBEX a provisional stabilisation solution was put forward. This stabilisation utilised the excellent properties of TECCO® GREEN for both strength and greening capabilities. Quantum Geotechnical employed Remedy Geotechnics to ensure the provisional design was suitable, and all was agreed.

Geologie

Brithdir Member - Sandstone. Sedimentary Bedrock formed approximately 308 to 310 million years ago in the Carboniferous Period.

These sedimentary rocks are fluvial in origin. They are detrital, ranging from course- to fine-grained and form beds and lenses of deposits reflecting the channels, Floodplains, and levees of a river.

Massnahme

After harvesting of all trees on the full slope and specialist removal of tree stumps and roots on the slip plane, drilling works started from top down. In total 19 rolls of TECCO® GREEN, were installed with 150 soil nails.

Kunde

Neath Port Talbot county borough council

Ausführende Firma

Quantum Geotechnical

Geschützte Objekte

Strasse, Wohngebiet, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

Remedy Geotechnics

Subunternehmer

iBEX technical access

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail