Minen und Bergbau - Craster Quarry Car Park 2019

First small rock fall stopped only days after completion.

Minen und Bergbau - Craster Quarry Car Park 2019

The imposing west wall, showing recent rock fall.

Minen und Bergbau - Craster Quarry Car Park 2019

Posts in place ready for pulling of ring net panels. Note the rope separation for a direction change from the west wall to the back wall of the quarry.

Minen und Bergbau - Craster Quarry Car Park 2019

Change of direction after completion of the barrier.

Minen und Bergbau - Craster Quarry Car Park 2019

Attaching of the secondary mesh.

 

Systeme

 

Installationsjahr

2019

Ausgangslage

The client planned to extend the current car park. It was identified that the new areas of the car park could be at risk of falling rocks from the quarry walls. The designer calculated that the energy of the falling blocks would require a 2 metres high 500 kJ rockfall barrier.

Massnahme

We were approached by the client asking for advice on which would be the best barrier to use for this project.  After being presented the options he went for the RXE-500. This gave a good balance between cost, performance, and ease of installation in the expected ground conditions.

Colin Jones (Rock Engineering) were selected to install the barrier, on arriving at site it was rapidly ascertained that the ground conditions were not rock at surface as expected, but a several metres thick layer of made up ground.  Both the client and contractor were impressed with the speed we were able to mobilise to site. Within a few hours, we had a new plan in place for post bases and anchors using Geobrugg standard details enabling a rapid approval by the design engineer.

The barrier was built two weeks ahead of the schedule programmed by the contractor. They attributed this to the ease of installation combined with the clarity of the manuals along with the ease of support via telephone or site visits from Geobrugg engineers.

Land/Region

Vereinigtes Königreich (UK)

Kunde

Northumberland County Council

Planer

Daeargeo

Ausführende Firma

Colin Jones (Rock Engineering) Ltd.

Geschützte Objekte

Steinbruch / Bergbau, Touristische Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail