Cinque Terre: reopens the Via dell'Amore

Böschungsstabilisierung - Cinque Terre: reopens the Via dell'Amore 2023

Protection of the footpath with TECCO G65/4 INOX mesh

Böschungsstabilisierung - Cinque Terre: reopens the Via dell'Amore 2023

ROCCO barriers installed along the slope

Böschungsstabilisierung - Cinque Terre: reopens the Via dell'Amore 2023

Close up of the P33 spike plate, ropes and wire rope clips

 

Installationsjahr

2023

Ausgangslage

In 2012, the fall of some rock blocks on the Via dell’Amore forced the closure of the path that runs sheer to the sea and crosses the Cinque Terre National Park in the Italian region Liguria.

This long and demanding project, financed by the Region of Liguria, included the construction of safety works to protect the footpath from falling rocks, the consolidation of some areas of the rocky slope, and an artificial tunnel.

After eleven, it is finally time to reopen the initial section of one of the world’s most iconic UNESCO World Heritage Sites.

Geologie

Metamorphic

Massnahme

To protect the Via dell’Amore from rockfall risk, the contractor, Gheller, installed our ROCCO barriers (1000-2000-3000 kJ). The peculiarity of these barriers lies in the fact that they have been subjected to a series of additional tests, compared to those required by current regulations, to verify the behavior even in conditions of abnormal and eccentric impact, thus raising the standards of quality and especially of safety.

Furthermore, given the highly aggressive environment due to continuous exposure to saltiness, it was chosen to install TECCO G65/4 INOX mesh for slope stabilization, which guarantees maximum performance in terms of tensile strength and puncture resistance.

Planer

Ausführende Firma

Geschützte Objekte

Strasse, Touristische Infrastruktur

Korrosionsschutz

INOX / STAINLESS

Ansprechpartner

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

John Kalejta
 

John Kalejta

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,KS 67226 Wichita / USA

E-Mail

Bob Lyne
 

Bob Lyne

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Geobrugg North America, LLC,OR 97302 Salem / USA

E-Mail