瑞士
瑞士

myGeobrugg

Cinque Terre: reopens the Via dell'Amore

边坡稳定 - Cinque Terre: reopens the Via dell'Amore 2023

Protection of the footpath with TECCO G65/4 INOX mesh

边坡稳定 - Cinque Terre: reopens the Via dell'Amore 2023

ROCCO barriers installed along the slope

边坡稳定 - Cinque Terre: reopens the Via dell'Amore 2023

Close up of the P33 spike plate, ropes and wire rope clips

情况

In 2012, the fall of some rock blocks on the Via dell’Amore forced the closure of the path that runs sheer to the sea and crosses the Cinque Terre National Park in the Italian region Liguria.

This long and demanding project, financed by the Region of Liguria, included the construction of safety works to protect the footpath from falling rocks, the consolidation of some areas of the rocky slope, and an artificial tunnel.

After eleven, it is finally time to reopen the initial section of one of the world’s most iconic UNESCO World Heritage Sites.

地質學

Metamorphic

描述

To protect the Via dell’Amore from rockfall risk, the contractor, Gheller, installed our ROCCO barriers (1000-2000-3000 kJ). The peculiarity of these barriers lies in the fact that they have been subjected to a series of additional tests, compared to those required by current regulations, to verify the behavior even in conditions of abnormal and eccentric impact, thus raising the standards of quality and especially of safety.

Furthermore, given the highly aggressive environment due to continuous exposure to saltiness, it was chosen to install TECCO G65/4 INOX mesh for slope stabilization, which guarantees maximum performance in terms of tensile strength and puncture resistance.

承包商

防护对象

Road, Touristic infrastructure

腐蚀保护

INOX / STAINLESS

工程

本地联系方式

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Country Manager Ost- und Zentralschweiz, Liechtenstein

联系地址

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG,Industriestrasse 21,5200 Brugg / 瑞士 Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

联系地址

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / 瑞士 Project Manager Inspection Services

联系地址

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

自然災害防護
Hydraulic Engineering
矿井/隧道
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / 瑞士 Ticino Country Manager

联系地址