Ausgangslage

The B104 road in Baie du Cap consists of several dangerous curves with mountain vertical slopes on one side over 25 metres high and ravines on the other side. The road is about six metres wide with enlargement at the curves and viewpoints. This road is the major link between the western Coast and the Central Plateau.

Over the years, the road has deteriorated because of storm water drain paths, causing instability and settlement on the road edges and creating bulging of the masonry retaining walls because of slip panes. Severe deterioration along 1200 metres of road has been noted.

Massnahme

The site required a cost-effective protection system, one that actively and permanently stabilizes the problematic slope. The applied protection system must further consider the troublesome site conditions: an almost vertically unstable slope with very limited accessibility, challenging geological conditions, intense rainfalls, and several installation time constraints. The decision fell on a technology, that respects the challenging site conditions and at the same time blends with nature: The TECCO system, utilizing a flexible facing with a nailed solution.

The high-tensile steel wire mesh is installed from the top, and rolled down the slope and pre-tensioned via the spike plates and the soil nails onto the slope.

Ausführende Firma

Geschützte Objekte

Strasse, Touristische Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Planer

ARQ Mauritius

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail