USA
USA

myGeobrugg

Baia Mare - Sighetul Marmaţiei

Böschungsstabilisierung - Baia Mare - Sighetul Marmaţiei 2019

Panoramic view onto the stabilized area

Böschungsstabilisierung - Baia Mare - Sighetul Marmaţiei 2019

Area to be protected by our slope stabilisation

Böschungsstabilisierung - Baia Mare - Sighetul Marmaţiei 2019

GBE-500A protects the road from upcoming rockfalls

Böschungsstabilisierung - Baia Mare - Sighetul Marmaţiei 2019

TECCO system adapts perfectly to the soil

 

Installationsjahr

2019

Ausgangslage

Between Baia Mare and Sighetul Marmației, the highway DN18 crosses a hilly area, rich in vegetation, with significant differences in level. In spring and seasons with heavy rainfall there is an increased risk of landslides. Therefore, it was decided to intervene in six areas within the project, with protective measures against rock falls or landslide prevention.

Geologie

Versanți alcătuiți preponderent din roci vulcanice, cu grad de alterare mediu spre mare.

Massnahme

It was decided to install a high-performance protection and stabilization system in five areas.

As there were no indications of global stability problems, this was considered satisfying, so only surface instabilities were analyzed in the design calculations. For this purpose, Geobrugg's RUVOLUM® program was used. Also, partial safety coefficients according to EUROCOD 7 were applied. Depending on the geo-specific conditions of each area, the calculations resulted in the need for TECCO G45/2 and TECCO G65/3 systems, respectively, in combination with solid bar anchor rods Ø 25 - 28 mm.

In compliance with the relevant legislation, it was necessary to carry out tensile tests on three separate anchors for each zone to confirm the anchors' ability to transfer the forces resulting from the design calculations to the ground. In the last position of the project, a 500 kJ GBE 500A rockfall protection barrier (L= 70 m, H = 2.0 m) was ordered.

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING, GEOBRUGG ULTRACOATING

Planer

Weitere verbaute Anwendungen

Steinschlagschutz

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail