Stromeferry Railway Station

off A890, IV53 8UH, Stromeferry, Vereinigtes Königreich (UK)
2021
Kunde
Network Rail
Planer
Ausführende Firma
Scots Rope Access
Geschützte Objekte
Eisenbahn
Korrosionsschutz
GEOBRUGG SUPERCOATING
Stabilisierte Fläche
560 m²
Maximale Hanghöhe
7 m
Hangneigung
80 ° - 90 °
Ausrichtung
Nord
Ausgangslage

Several rock blocks had fallen into the cess, the largest of which was 1.8 x 1.0 x 0.7 cubic meters. After inspection, a length of 80 meters was found to have the potential for failure.
The designer needed a strong solution, which was quick to design and rapidly available for emergency repairs.

Geologie

Lewisian Gneiss

Massnahme

We supplied TECCO G65/3 on short notice to a remote site in the Highlands. While working with the designer in the background, we ensured they had all the necessary technical data for their design.

Ansprechpartner

Roger Moor
Roger Moor
Country Manager Ost- und Zentralschweiz, Liechtenstein
Naturgefahren, Uferschutz, Minen / Bergbau / Tunnel
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Schweiz
René Müller
René Müller
Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS
Naturgefahren, Minen / Bergbau / Tunnel
Geobrugg AG
Industriestrasse 21
5200 Brugg / Schweiz
Alexander Bittendorfer
Alexander Bittendorfer
Global Project Manager Services
Naturgefahren
Geobrugg AG
Aachstrasse 11
8590 Romanshorn / Schweiz
Isacco Toffoletto
Isacco Toffoletto
Ticino Country Manager
Naturgefahren, Minen / Bergbau / Tunnel
Geobrugg AG
Stabile Cometal, via Pizzante 7
6595 Riazzino / Schweiz