Schweiz
Schweiz

myGeobrugg

Exit portal Railway Tunel Biobío

Böschungsstabilisierung - Exit portal Railway Tunel Biobío 2022

Front view of the Exit Portal

Böschungsstabilisierung - Exit portal Railway Tunel Biobío 2022

Setting out anchors

Böschungsstabilisierung - Exit portal Railway Tunel Biobío 2022

Drilling process

Böschungsstabilisierung - Exit portal Railway Tunel Biobío 2022

Top view of the portal

Böschungsstabilisierung - Exit portal Railway Tunel Biobío 2022

View of the portal and the railway bridge under construction

 
 

Installationsjahr

2022

Ausgangslage

The new Biobío railway bridge project in the city of Concepción included a new railway line with a tunnel through Chepe Hill. The portals of this tunnel had to be reinforced. The system designed for this reinforcement was shotcrete and 9 meters long anchor bolts.

Geologie

Weathered granitic rocks of the coastal batholith (maicillo)

Massnahme

Geobrugg was approached for a solution that reduces the intervention's visual impact and the reinforcement's carbon footprint. With these requirements in mind, Geobrugg proposed replacing the shotcrete with TECCO GREEN mesh, which has a lower carbon footprint and allows the portals to be revegetated.

Land/Region

Chile

Kunde

Ausführende Firma

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Umweltingenieur

Naturgefahren
Uferschutz/Wasserbau
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz , Msc. Env. Eng. Umweltingenieur

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail