スイス
スイス

myGeobrugg

 - Exit portal Railway Tunel Biobío 2022

Front view of the Exit Portal

 - Exit portal Railway Tunel Biobío 2022

Setting out anchors

 - Exit portal Railway Tunel Biobío 2022

Drilling process

 - Exit portal Railway Tunel Biobío 2022

Top view of the portal

 - Exit portal Railway Tunel Biobío 2022

View of the portal and the railway bridge under construction

 
 

設置年

2022

状況

The new Biobío railway bridge project in the city of Concepción included a new railway line with a tunnel through Chepe Hill. The portals of this tunnel had to be reinforced. The system designed for this reinforcement was shotcrete and 9 meters long anchor bolts.

地質

Weathered granitic rocks of the coastal batholith (maicillo)

説明

Geobrugg was approached for a solution that reduces the intervention's visual impact and the reinforcement's carbon footprint. With these requirements in mind, Geobrugg proposed replacing the shotcrete with TECCO GREEN mesh, which has a lower carbon footprint and allows the portals to be revegetated.

国名

チリ

顧客名

落札者

保護対象

鉄道

腐食防止

ジェオブルッグ スーパーコーティング

担当者の連絡先

René Müller
   

René Müller

Country Manager Western Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG,Industriestrasse 21,5200 Brugg / スイス Country Manager Western Switzerland

お問い合わせフォーム

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Project Manager Sales Eastern Switzerland

お問い合わせフォーム

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

自然災害防護
モニタリングサービス
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / スイス Project Manager Inspection Services

お問い合わせフォーム

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

自然災害防護
Hydraulic Engineering
鉱山/トンネル
Geobrugg AG Ticino,Via Brusada 5,6933 Muzzano / スイス Country Manager Southern Switzerland

お問い合わせフォーム