Switzerland
Switzerland

myGeobrugg

Monitoring - Railway Iseo - Edolo 2023

It only takes a few minutes to install the GUARD, immediately ready for use

Monitoring - Railway Iseo - Edolo 2023

The GUARD system must be diversely positioned to collect as many signals as possible. In this case, it was placed on the upslope rope of the five meters high GBE-2000A barrier.

Monitoring - Railway Iseo - Edolo 2023

Also on debris flow barriers, the monitoring system improves safety

Monitoring - Railway Iseo - Edolo 2023

View of Lake Iseo from the five meters high GBE-2000A barrier equipped with GUARD monitoring system

 

Year of installation

2023

Initial situation

In December 2021, the train on the railway line between Iseo and Edolo derailed due to a rockfall on the tracks.

After this accident, Ferrovie Nord initiated a project that included the installation of both rockfall and debris flow barriers at eight points deemed to be at very high risk. To further enhance safety, 31 GUARD monitoring devices were installed to have real-time information about rockfall events that could co-involve the barriers.

Description

During the execution phase, our technical department collaborated with the Nord_Ing bureau to place the project rockfall barriers directly on site.

In addition to the 31 GUARDs, we also supplied 12,000 m² of TECCO G65/4 and the following barriers:

- 7 GBE-2000A H5 rockfall barriers, totaling 2100 m²

- 1 Debris Flow VX-080 H4

- 1 rockfall barrier GBE-3000A H6

Contractor

A.C.V. srl

Protected object

Railway

Engineering

Nord_ING

Other installed applications

Rockfall Protection

Your local contact

Roger Moor
   

Roger Moor

Country Manager Ost- und Zentralschweiz, Liechtenstein

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Country Manager Ost- und Zentralschweiz, Liechtenstein

E-Mail

René Müller
   

René Müller

Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG,Industriestrasse 21,5200 Brugg / Switzerland Country Manager Kantone AG BE BL BS FR GE JU NE SO VD VS

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Natural Hazards
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Switzerland Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Ticino Country Manager

Natural Hazards
Hydraulic Engineering
Mining / Tunnels
Geobrugg AG Ticino,Stabile Cometal, via Pizzante 7,6595 Riazzino / Switzerland Ticino Country Manager

E-Mail