Böschungsstabilisierung - Slunj 2021

SPIDER mesh S3-130 prevents the historic building from collapsing

Böschungsstabilisierung - Slunj 2021

A slope stabilization system protects the historic landmark

 
 

Installationsjahr

2021

Ausgangslage

At the historical Slunj fortress, blocks of the limestone base collapsed. The ruins of Slunj were in danger.

Geologie

Limestone

Massnahme

The city of Slunj, the Croatian Government, and an EU fond were invested in rehabilitating the old fortress. It was stabilized with a concrete beam with nails then covered with a stone wall. Our part is the stabilization of the base of the fortress and the protection of people walking nearby. In a first step Spider S3-130 mesh with nails (32 mm, length 4 m) was installed. The protection of other areas of the slope with TECCO mesh G65/3 is planned.

Land/Region

Kroatien

Planer

Geschützte Objekte

Touristische Infrastruktur, Architektur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern and Central Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG Project Manager Sales Eastern and Central Switzerland

E-Mail

Matthias Denk, Msc. Env. Eng.
 

Matthias Denk

Umweltingenieur

Naturgefahren
Uferschutz/Wasserbau
Geobrugg AG,Aachstrasse 11,8590 Romanshorn / Schweiz , Msc. Env. Eng. Umweltingenieur

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Fernüberwachung
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail