Böschungsstabilisierung - Slunj 2021

SPIDER mesh S3-130 prevents the historic building from collapsing

Böschungsstabilisierung - Slunj 2021

A slope stabilization system protects the historic landmark

 

Installationsjahr

2021

Ausgangslage

At the historical Slunj fortress, blocks of the limestone base collapsed. The ruins of Slunj were in danger.

Geologie

Limestone

Massnahme

The city of Slunj, the Croatian Government, and an EU fond were invested in rehabilitating the old fortress. It was stabilized with a concrete beam with nails then covered with a stone wall. Our part is the stabilization of the base of the fortress and the protection of people walking nearby. In a first step Spider S3-130 mesh with nails (32 mm, length 4 m) was installed. The protection of other areas of the slope with TECCO mesh G65/3 is planned.

Planer

Geschützte Objekte

Touristische Infrastruktur, Architektur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

John Kalejta
 

John Kalejta

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,KS 67226 Wichita / USA

E-Mail

Bob Lyne
 

Bob Lyne

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Geobrugg North America, LLC,OR 97302 Salem / USA

E-Mail