Hangmuren- und Murgangschutz - Plimmerton 2023

Site 1: VX100, 21 metres wide, 5 metres high debris flow barrier

Hangmuren- und Murgangschutz - Plimmerton 2023

Site 1: VX100, 21 metres wide, 5 metres high debris flow barrier - Blending into nature

Hangmuren- und Murgangschutz - Plimmerton 2023

Site 1: Geobrugg abrasion protection

Hangmuren- und Murgangschutz - Plimmerton 2023

Site 2: VX100, 15 metres wide, 5 metres high debris flow barrier - Blending into nature

Hangmuren- und Murgangschutz - Plimmerton 2023

Site 2: VX100, 15 metres wide, 5 metres high debris flow barrier

Hangmuren- und Murgangschutz - Plimmerton 2023

Site 3: VX100, 15 metres wide, 5 metres high debris flow barrier

 

Installationsjahr

2023

Ausgangslage

Three sites within the Karehana Bay Scenic Reserve located in Karehana Bay, Plimmerton, experienced debris flows following heavy rainfall on 29 November 2020. ENGEO completed an assessment of the three sites and concluded that a significant debris flow hazard is present and that mitigation solutions need to be implemented to reduce the risk to life safety to an acceptable level.

Massnahme

Geobrugg VX100 debris flow barriers were installed at the three debris flow locations. The barriers are 5 metres high and have top rope spans of 15 to 21 metres. The system withstands impact pressures up to 100 kN per m²

A secondary mesh was used for aperture control. The high-tensile ring mesh and ropes cause minimal visual pollution and were constructed with minimal environmental pollution or disturbance.

The barriers are designed and tested according to EAD-340020-00-0106-Flexible kits for retaining debris flows and shallow landslides.

Land/Region

Neuseeland

Kunde

Porirua City Council

Planer

ENGEO

Ausführende Firma

Geovert

Geschützte Objekte

Wohngebiet

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

René Müller
   

René Müller

Country Manager Western Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Industriestrasse 21,5200 Brugg / Schweiz Country Manager Western Switzerland

E-Mail

Olivia Sartorius
   

Olivia Sartorius

Project Manager Sales Eastern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG Project Manager Sales Eastern Switzerland

E-Mail

Alexander Bittendorfer
   

Alexander Bittendorfer

Project Manager Inspection Services

Naturgefahren
Geobrugg AG,Trucks via road 14 or 13 only!, Aachstrasse 11,8590 Romanshorn / Schweiz Project Manager Inspection Services

E-Mail

Isacco Toffoletto
   

Isacco Toffoletto

Country Manager Southern Switzerland

Naturgefahren
Uferschutz/Wasserbau
Minen / Bergbau / Tunnel
Geobrugg AG,Via Brusada 5,6933 Muzzano / Schweiz Country Manager Southern Switzerland

E-Mail