USA
USA

myGeobrugg

Steinschlagschutz - Northfleet 2023

Overview protected area and rockfall protection fence

Steinschlagschutz - Northfleet 2023

Upslope view of completed barrier

Steinschlagschutz - Northfleet 2023

Aerial view of barrier

Steinschlagschutz - Northfleet 2023

View along fence line

Steinschlagschutz - Northfleet 2023

View of lateral anchors

Steinschlagschutz - Northfleet 2023

Completed barrier

 

Systeme

 

Systemlänge

60 m

 

Installationsjahr

2023

Ausgangslage

The scheme involved rockfall protection works below an existing chalk cliff. The site is part of an old chalk quarry, and previous works have been undertaken across the site to address rockfall issues.

The geology is that of the Seaford Chalk Formation. Previous investigations describe the rock as extremely weak to weak low to medium-density chalk with occasional iron staining and flint seams. Generally, bedding discontinuities dip into the cliffs, favouring stability.

Following a failure along the cliff line to the east, the decision was made to install rockfall protection measures below the promontory of the cliff above the road. The chalk on the 'nose' of the slope is around 60 degrees with a maximum height of 35 metres and heights of 12 - 16 metres on its east and west faces where the slope angle increases to near vertical.  

Small amounts of rockfall were noted, with typical block sizes between 25 - 100 mm.

Massnahme

The site owners instructed RSK Geosciences to undertake a rockfall assessment of the site and provide recommended remediation measures. This came in the form of a Rock Fall Catch Fence Design and Specification Report, which included a detailed rockfall analysis of the site using the software RocFall.

Following rockfall analysis modelling, a rockfall barrier was recommended as an appropriate solution. Based on modelling, the appropriate capacity and height of this system was a 500 kJ three-meter high barrier. Due to site conditions and the reduced installation time required, the decision was made for the barrier not to have upslope anchors, thus saving time on site with less drilling required. The chosen rockfall barrier was a GBE-500A-R, 60 meters in length, with seven fence posts.

Geobrugg worked with RSK during the design to provide anchor force datasheets for the chosen barrier to assist with anchor length calculations and provide technical datasheets for the chosen flexheads (Type IV) to suit the bar used on site (R38-500).

The contractor chosen to undertake the works was CAN Geotechnical Ltd. CAN drilled anchors for the fence posts and lateral anchors before casting concrete bases for the base plates. Installation of the flexheads on the lateral anchors followed, and then the fence posts were lifted into place and secured. Ropes were installed before the mesh panels were opened, and final fittings were added. Following a visit to site, Geobrugg assisted with a slight change to the fence arrangement due to a change of angle and additional downslope rope requirement. We were able to work swiftly with the contractor to ensure no delays occurred on site.

The installation ran smoothly, and Geobrugg attended the site to assist with the installation and check the final system.

Land/Region

Vereinigtes Königreich (UK)

Kunde

CAN Geotechnical Ltd

Ausführende Firma

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin Coyle
 

Kevin Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,CT 06237 Columbia / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

John Kalejta
 

John Kalejta

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,KS 67226 Wichita / USA

E-Mail

Bob Lyne
 

Bob Lyne

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,NC 27358 Summerfield / USA

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Geobrugg North America, LLC,OR 97302 Salem / USA

E-Mail