USA
USA

myGeobrugg

Hangmuren- und Murgangschutz - Montecito 2019

Completed flexible debris flow barrier - Picture: Kane Geotech

Hangmuren- und Murgangschutz - Montecito 2019

Completed flexible debris flow barrier - Picture: Kane Geotech

Hangmuren- und Murgangschutz - Montecito 2019

Installed flexible debris flow barrier - The overall footprint of the constructed net is relatively small. Picture: Kane Geotech

Hangmuren- und Murgangschutz - Montecito 2019

Installation of a flexible debris flow barrier. Picture: Kane Geotech

Hangmuren- und Murgangschutz - Montecito 2019

Filled barrier in San Ysidro Canyon in January 2023. Picture: Santa Barbara Independent

Hangmuren- und Murgangschutz - Montecito 2019

Installed flexible debris flow barrier - A large basal opening allows fish and wildlife passage. Picture: Kane Geotech

Hangmuren- und Murgangschutz - Montecito 2019

Montecito endured catastrophic flooding and debris flow following a strong rainstorm in the early morning hours of January 9, 2018: https://www.montecitojournal.net/2018/12/27/the-year-in-review-2018/

 

Systeme

VX VX160-H6 Sonderlösungen

 

Systemlänge

17 m - 25 m

 

Installationsjahr

2019

Ausgangslage

Description by Gurrola and Rogers (2022): The 1-9 debris flow event was preceded by the Thomas Fire, which started in Ventura County on December 5, 2017, and, due to Santa Ana wind conditions, quickly burned westward into the watersheds of Montecito and Carpinteria. Three weeks after the wildfire decimated the vegetation of the Montecito watersheds, a narrow, cold front on January 9, 2018, triggered post-fire debris flows that devastated the community of Montecito (Lancaster et al., 2021; Kean et al., 2019; Lukashov et al., 2019).

The 1-9 event resulted in twenty-three (23) fatalities, damaged or destroyed over 500 homes, damaged infrastructure, including closing Highway 101 for thirteen days, and caused an estimated billion dollars in economic losses (Lancaster et al., 2021; County of Santa Barbara OEM, 2018; Niehaus, 2018 and 2019; Kean et al., 2019).

More information can be found in the following report by Gurrola and Rogers (2022): https://www.tprcsb.org/_files/ugd/056f9d_0230d73eec4b41829cfc6368e3dadda0.pdf

Massnahme

Six Geobrugg flexible debris flow nets have been installed in San Ysidro, Buena Vista, and Cold Springs Canyons. The construction was closely monitored by a supervising biologist, a geologist, and a geo-tech engineer to ensure that the environmental conditions of the building permits and authorizations from the multiple governmental agencies were carefully maintained (https://www.tprcsb.org/nets).

In Cold Springs Canyon, a VX160-H6 and a specially adapted VX-barrier were installed with a total retention capacity of 9'650 CY / 7'378 m3. With these two flexible barriers, the retention capacity of the existing debris basin from 1964 is nearly doubled.

In San Ysidro Canyon, two specially adapted VX-barrier were installed with a total retention capacity of 15'950 CY / 12'200 m3. These barriers add nearly 200% to the existing debris basin at the mouth of the canyon, built in 1964.

In Buena Vista Canyon, two of the seven permitted flexible barriers have been installed so far. These are a specially adapted VX-barrier and a VX160-H6 with a total retention capacity of 11'700 CY / 8'950 m3. Buena Vista Canyon has no other retention capacity so far.

Ausführende Firma

Geschützte Objekte

Strasse, Gebäude, Wohngebiet, Infrastruktur

Korrosionsschutz

GEOBRUGG SUPERCOATING

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail