myGeobrugg
2020
Due to heavy rain in 2020, the JiJi Railway encountered a slope failure (at Sta.K18+300). A rigid H-pile fence could not guarantee the required safety for the railway.
The Taiwan Railways Administration (TRA) decided to stabilize the rockface with TECCO System.
Taiwan
United Geotech, INC.
Jin Xin Engineering Co., Ltd.
Eisenbahn
GEOBRUGG SUPERCOATING