USA
USA

myGeobrugg

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Overall view of the project and the slope

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Rear of the berm and the barrier

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Rockfall barrier and slope stabilization system

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

View of the GBE barrier, TECCO system, and the protected road

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Close-up view of mesh on the barrier

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Aerial view of the stabilizing mesh and the rockfall protection barrier

Steinschlagschutz - Cuenca - Molleturo - Km. 49 2023

Aerial view of the slope stabizliation system and the barrier

 

Systemlänge

120 m

 

Installationsjahr

2023

Ausgangslage

A significant landslide and continuous rockfall were issues for the Cuenca-Molleturo road at km 49. Rockfall and landslide protection were necessary for the safety of the road. Thus, the Ministry of Transportation and Public Works carried out a large-scale project to stabilize the slope with terraces.


Massnahme

In addition to the terraces, TECCO mesh prevents surface landslides, and a dynamic rockfall protection barrier will hold back future rockfall. 

Geobrugg and Pivaltec S.A. supplied a GBE-100A-R rockfall barrier with a total length of 120 meters and a TECCO G65/3 system covering an area of 2800 m².

Kunde

MTOP - Ministerio de Transportes y Obras Publicas

Geschützte Objekte

Strasse

Korrosionsschutz

GEOBRUGG SUPERCOATING

Weitere verbaute Anwendungen

Böschungsstabilisierung

Ansprechpartner

Kevin H. Coyle
 

Kevin H. Coyle

Regional Manager Northeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3 Beaudet Terr,Columbia CT 06237 / USA Regional Manager Northeast

E-Mail

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8921 Emperor Ave.,San Gabriel, California 91775 / USA Regional Manager California

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Central US

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,3215 67th Avenue Pl,Greeley CO 80634 / USA Regional Manager Central US

E-Mail

Bob Lyne
 

Bob Lyne

Regional Manager Southeast

Naturgefahren
Uferschutz/Wasserbau
Geobrugg North America, LLC,8004 Windspray Drive,Summerfield NC 27358 / USA Regional Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

General Manager Geobrugg North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer General Manager Geobrugg North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Sales Director

Naturgefahren
Geobrugg North America, LLC,Salem OR 97302 / USA Sales Director

E-Mail