USA
USA

myGeobrugg

Böschungsstabilisierung - Castle Beach 2023

Detailed view of the installed mesh and erosion control mat along the lower slope, ensuring safety and promoting regrowth

Böschungsstabilisierung - Castle Beach 2023

View from Cliff Road above the slope, highlighting the proximity of public infrastructure to the unstable area

Böschungsstabilisierung - Castle Beach 2023

Completed slope stabilization using TECCO® G65/3 Stainless mesh

Böschungsstabilisierung - Castle Beach 2023

The stabilized slope along Castle Beach showing the mesh system supporting the vegetation and blending into the natural surroundings

Böschungsstabilisierung - Castle Beach 2023

View of the slope above Castle Beach where erosion and slope movement posed a risk to beach-visitors and the road above

 
 

Installationsjahr

2023

Ausgangslage

At Castle Beach in Falmouth, Cornwall, a historic gabion slope was showing signs of severe deterioration due to corrosion of the plastic-coated mesh. This led to sections of the slope becoming unstable, resulting in rockfall onto the beach and raising concerns about a wider collapse that could compromise the upper slope and potentially undermine Cliff Road above.

Geologie

Made ground and gabions

Massnahme

Following site inspections and initial TECCO® G65/3 stainless mesh samples, a soil-nailed stabilization system was selected to secure the slope from the top to the concrete and granite-faced sea wall below. Slope modeling was carried out using the RUVOLUM software to determine the appropriate nail spacing and type based on the specific ground conditions.

TECCO® G65/3 Stainless mesh was installed for long-term slope stabilization, supported by Ischebeck INOX 30/11 self-drilling bars, chosen for their corrosion resistance and efficient installation. To help contain fine material and support regrowth, TECMAT erosion control matting was applied across the slope surface, promoting natural vegetation recovery over time.

Land/Region

Vereinigtes Königreich (UK)

Ausführende Firma

Geschützte Objekte

Strasse, Touristische Infrastruktur

Korrosionsschutz

INOX / STAINLESS

Kontakte: Bei Fragen sind wir gerne für Sie da.

Saleh Feidi
 

Saleh Feidi

Regional Manager California

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA Regional Manager California

E-Mail

Bryant Jackson
 

Bryant Jackson

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

E-Mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer Sales Director North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Regional Sales Manager Pacific Northwest and Hawaii

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,OR 97302 Salem / USA Regional Sales Manager Pacific Northwest and Hawaii

E-Mail