USA
USA

myGeobrugg

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

Shallow landslide barrier protecting the West Highland Line

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

Shallow landslide barrier and anchor

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

View of the SL-barrier, north end

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

Landslide barrier and brake ring

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

Solution to bottom support rope taut with foundation

Hangmuren- und Murgangschutz - Bridge of Orchy 2025

Barrier with the protected railway line underneath

 

Systeme

 

Systemlänge

45 m

 

Installationsjahr

2025

Ausgangslage

In 2020, a significant landslide occurred on the West Highland Line, primarily caused by water runoff through the hillside. The landslide blocked the railway, forcing a full route closure while repairs were undertaken.

Given the ongoing risk posed by heavy and persistent rainfall, the site conditions were closely monitored. As part of the long-term protection strategy, a 45-metre SL-150 barrier was installed to mitigate the impact on the railway from further landslips.

Massnahme

Working in collaboration with contractor QTS and designer Fairhurst, a 45-metre barrier solution was designed for Network Rail. Post spacing varies between 7 and 8 metres to suit the local topography.

We supported the project by supplying the barrier system and contributing technical input during the design and installation phases. Preserving the surrounding landscape was a key consideration; accordingly, the upslope anchor layout at the far end of the barrier was adapted to minimise environmental impact and reduce disruption during installation.

After the barrier installation, we carried out an in-house sign-off process called a CONSIS inspection to ensure the project met our rigorous quality and safety standards.

Network Rail made it clear that this sign-off was a critical part of the project’s delivery, reflecting their commitment to quality assurance and the successful delivery of the solution.

Land/Region

Vereinigtes Königreich (UK)

Kunde

Planer

Ausführende Firma

QTS

Geschützte Objekte

Eisenbahn

Korrosionsschutz

GEOBRUGG SUPERCOATING

Kontakte: Bei Fragen sind wir gerne für Sie da.

Saleh Feidi
 

Saleh Feidi

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,8921 Emperor Ave.,91775 San Gabriel, California / USA

E-Mail

Bryant Jackson
 

Bryant Jackson

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,22 Centro Algodones,87001 Algadones / USA

E-Mail

John Kalejta
 

John Kalejta

Regional Manager Rocky Mountains / Central USA

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,KS 67226 Wichita / USA Regional Manager Rocky Mountains / Central USA

E-Mail

Robert Long
 

Robert Long

Regional Sales Manager Southeast

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,24905 Winterberry LN,60585 Plainfield / USA Regional Sales Manager Southeast

E-Mail

Pierce Runnels, Civil Engineer
   

Pierce Runnels

Sales Director North America

Naturgefahren
Geobrugg North America, LLC,22 Centro Algodones,NM 87001 Algodones / USA , Civil Engineer Sales Director North America

E-Mail

Tim Shevlin
 

Tim Shevlin

Naturgefahren
Einschlagschutz
Geobrugg North America, LLC,2050 Timber St S,OR 97302 Salem / USA

E-Mail